Showing 76 results

Archival description
William Snaith fonds
Print preview View:
William Snaith fonds
William Snaith fonds
Thesis (undergraduate), Civil Engineering
Thesis (undergraduate), Civil Engineering
Drawing B-10—6-150-d. Suspended conveyors, Tower “X”. Unnumbered
Drawing B-10—6-150-d. Suspended conveyors, Tower “X”. Unnumbered
Drawing B-10-2-149-d. General Drawing. Bucyrus electric revolving shovel, No 225-B. No. 5
Drawing B-10-2-149-d. General Drawing. Bucyrus electric revolving shovel, No 225-B. No. 5
Drawing B-10-5-117-b. Air reheater. No. 14
Drawing B-10-5-117-b. Air reheater. No. 14
Drawing B-10-6-152-c. Suspended conveyors: anchors for legs of Tower “X”. Unnumbered
Drawing B-10-6-152-c. Suspended conveyors: anchors for legs of Tower “X”. Unnumbered
Drawing B-10-1-121-c. Railway crossing gate. No. 21
Drawing B-10-1-121-c. Railway crossing gate. No. 21
Snaith, William. “The Construction Plant, Equipment, and Structures of the Niagara Power Development Scheme of the Hydro-Electric Power Commission of Ontario”Volume II. Drawings. 7-1-27-b: General Plan. Niagara Power Development. 2 copies No. 1
Snaith, William. “The Construction Plant, Equipment, and Structures of the Niagara Power Development Scheme of the Hydro-Electric Power Commission of Ontario”Volume II. Drawings. 7-1-27-b: General Plan. Niagara Power Development. 2 copies No. 1
Drawing 7-3-92-e. Canal: profile on central line. No. 3
Drawing 7-3-92-e. Canal: profile on central line. No. 3
Drawing B-10-1-106. General layout of construction railway. No. 16
Drawing B-10-1-106. General layout of construction railway. No. 16
Drawing B-10-1-96-a. Bridge tell-tale. No. 24
Drawing B-10-1-96-a. Bridge tell-tale. No. 24
Drawing B-10-9-160-c. Camp building No. 98: foundation plan; front and end elevations; section A-A. No. 51
Drawing B-10-9-160-c. Camp building No. 98: foundation plan; front and end elevations; section A-A. No. 51
Drawing B-10-6-144-d. Stone crushing plant: Screen, No. 5 crusher and Tower “W” plan. Unnumbered
Drawing B-10-6-144-d. Stone crushing plant: Screen, No. 5 crusher and Tower “W” plan. Unnumbered
Drawing B-10-1-81-a. Sketch showing alternative railways to powerhouse. No. 17
Drawing B-10-1-81-a. Sketch showing alternative railways to powerhouse. No. 17
Drawing B-10-1-84-c. Elevations of semaphore. No. 26
Drawing B-10-1-84-c. Elevations of semaphore. No. 26
Drawing B-10-1-85-c. Details of semaphore. No. 27
Drawing B-10-1-85-c. Details of semaphore. No. 27
Drawing B-10-1-83-c. Train order signal. No. 28
Drawing B-10-1-83-c. Train order signal. No. 28
Drawing B-10-10-182-c. Portable trolley wire support. No 29
Drawing B-10-10-182-c. Portable trolley wire support. No 29
Drawing B-10-9-166-c. Camp building No. 100 &101; foundation plan; front and end elevations; sections A-A and B-B. No. 55 sheet 2 of 2 sheets
Drawing B-10-9-166-c. Camp building No. 100 &101; foundation plan; front and end elevations; sections A-A and B-B. No. 55 sheet 2 of 2 sheets
Drawing B-10-9-170-c. Boarding camp at Chippawa, Building No. 103: elevations and section; bill of materials for fire escape. No. 58.
Drawing B-10-9-170-c. Boarding camp at Chippawa, Building No. 103: elevations and section; bill of materials for fire escape. No. 58.
Drawing B-10-6-135-c. Towers and suspended conveyors: details of anchors for towers “Y” & “Z”. Unnumbered
Drawing B-10-6-135-c. Towers and suspended conveyors: details of anchors for towers “Y” & “Z”. Unnumbered
Drawing B-10-6-136-d. Suspended stone conveyors, Towers “Y” & “Z”: elevations. Unnumbered
Drawing B-10-6-136-d. Suspended stone conveyors, Towers “Y” & “Z”: elevations. Unnumbered
Drawing B-10-6-147-d. Stone storage: proposed layout of 1” stone reclaiming conveyors. Unnumbered
Drawing B-10-6-147-d. Stone storage: proposed layout of 1” stone reclaiming conveyors. Unnumbered
Drawing B-10-1-93. Construction of railway: standard switch layout for No. 8 rigid frog & 15 ft. switching points. No. 20
Drawing B-10-1-93. Construction of railway: standard switch layout for No. 8 rigid frog & 15 ft. switching points. No. 20
Drawing B-10-10-243-c. Double bridge warning for construction of railway. No. 25
Drawing B-10-10-243-c. Double bridge warning for construction of railway. No. 25
Drawing B-4-1-161-d. Railway trestle at Bowman’s Gully. No. 32 2 copies
Drawing B-4-1-161-d. Railway trestle at Bowman’s Gully. No. 32 2 copies
Drawing B-10-9-153-b. Bunkhouse No. 23, Division No. 4: floor plan, elevations, cross section. No. 50
Drawing B-10-9-153-b. Bunkhouse No. 23, Division No. 4: floor plan, elevations, cross section. No. 50
Drawing B-10-9-164-c. Camp building No. 98: hot water heating system. No. 53
Drawing B-10-9-164-c. Camp building No. 98: hot water heating system. No. 53
Drawing B-10-6-138-b. Suspended conveyors, Tower “Y”: Bracing at foot of tower. Unnumbered
Drawing B-10-6-138-b. Suspended conveyors, Tower “Y”: Bracing at foot of tower. Unnumbered
Drawing B-10-6-145-d. Stone crushing plant: Screen, No. 5 crusher and Tower “W” plan – elevation and section. Unnumbered
Drawing B-10-6-145-d. Stone crushing plant: Screen, No. 5 crusher and Tower “W” plan – elevation and section. Unnumbered
Drawing B-10-6-146-d. Stone crushing plant: Screen, No. 5 crusher and Tower “W” elevations. Unnumbered
Drawing B-10-6-146-d. Stone crushing plant: Screen, No. 5 crusher and Tower “W” elevations. Unnumbered
Drawing B-10-1-95-b. Gate for right-of-way fence. No. 22
Drawing B-10-1-95-b. Gate for right-of-way fence. No. 22
Drawing B-10-1-94-b. Construction of disposal railway: typical sections of roadbed and details of fencing. No. 23
Drawing B-10-1-94-b. Construction of disposal railway: typical sections of roadbed and details of fencing. No. 23
Drawing B-10-6-147-d. Stone Storage: proposed layout of 1” reclaiming conveyors. No. 31
Drawing B-10-6-147-d. Stone Storage: proposed layout of 1” reclaiming conveyors. No. 31
Drawing B-10-9-161-c. Camp building No. 98: ground and second floor plan, with bill of material. No. 52
Drawing B-10-9-161-c. Camp building No. 98: ground and second floor plan, with bill of material. No. 52
Drawing B-10-9-165-c. Camp buildings No. 100 &101; first and second floor plans and bill of material. No. 54 sheet 1 of 2 sheets
Drawing B-10-9-165-c. Camp buildings No. 100 &101; first and second floor plans and bill of material. No. 54 sheet 1 of 2 sheets
Drawing B-10-9-167-b. Boarding camp at Chippawa, Building No. 103: foundation plan. No. 56
Drawing B-10-9-167-b. Boarding camp at Chippawa, Building No. 103: foundation plan. No. 56
Drawing B-10-99-169-c. Boarding Camp at Chippawa, Building No. 103: first and second floor plans; bill of materials. No. 57
Drawing B-10-99-169-c. Boarding Camp at Chippawa, Building No. 103: first and second floor plans; bill of materials. No. 57
Drawing B-10-6-137-d. Suspended stone conveyors, details of Towers “Y” & “Z”. Unnumbered
Drawing B-10-6-137-d. Suspended stone conveyors, details of Towers “Y” & “Z”. Unnumbered
Drawing B-10-6-151-d. Suspended stone conveyors: details of Tower “X”. Unnumbered
Drawing B-10-6-151-d. Suspended stone conveyors: details of Tower “X”. Unnumbered
Drawing B-1-1-1-e. Map showing properties adjacent to proposed location of intake, canal, power station. No. 2
Drawing B-1-1-1-e. Map showing properties adjacent to proposed location of intake, canal, power station. No. 2
Drawing B-10-4-120-c. General arrangement of cable reel for No. 103-c electric shovel. No. 6
Drawing B-10-4-120-c. General arrangement of cable reel for No. 103-c electric shovel. No. 6
Drawing B-10-4-119-c. Cable drum for electric shovel. No. 103-c. No. 7
Drawing B-10-4-119-c. Cable drum for electric shovel. No. 103-c. No. 7
Drawing B-10-4-117-a. Cable drum for electric shovel. No. 103-c. No. 8
Drawing B-10-4-117-a. Cable drum for electric shovel. No. 103-c. No. 8
Drawing B-10-4-112-c. Cable drum to feed electric shovel. No. 9
Drawing B-10-4-112-c. Cable drum to feed electric shovel. No. 9
Drawing B-10-4-114-a. Detail of trolley for cable drum. No. 11
Drawing B-10-4-114-a. Detail of trolley for cable drum. No. 11
Drawing B-10-5-103-c. Diagram of piping for compressed air. No. 13
Drawing B-10-5-103-c. Diagram of piping for compressed air. No. 13
Drawing B-10-9-145-a. General dimensions of temporary buildings. No. 33
Drawing B-10-9-145-a. General dimensions of temporary buildings. No. 33
Drawing B-10-9-103-c. General Office: first and second floor plans, and elevation. No. 42
Drawing B-10-9-103-c. General Office: first and second floor plans, and elevation. No. 42
Drawing B-10-9-119-c. Camp building: first and second floor plans. Capacity, 52 rooms. No. 45
Drawing B-10-9-119-c. Camp building: first and second floor plans. Capacity, 52 rooms. No. 45
Results 1 to 50 of 76