Drawing B-10-6-152-c. Suspended conveyors: anchors for legs of Tower “X”. Unnumbered
- UTA 1790-1-B1966-0017/001(76)+
- File
- 8 Jan 1919
Part of William Snaith fonds
Drawing B-10-6-152-c. Suspended conveyors: anchors for legs of Tower “X”. Unnumbered
Part of William Snaith fonds
Drawing B-10-6-151-d. Suspended stone conveyors: details of Tower “X”. Unnumbered
Part of William Snaith fonds
Drawing B-10—6-150-d. Suspended conveyors, Tower “X”. Unnumbered
Part of William Snaith fonds
Drawing B-10-6-147-d. Stone storage: proposed layout of 1” stone reclaiming conveyors. Unnumbered
Part of William Snaith fonds
Part of William Snaith fonds
Part of William Snaith fonds
Drawing B-10-6-144-d. Stone crushing plant: Screen, No. 5 crusher and Tower “W” plan. Unnumbered
Part of William Snaith fonds
Drawing B-10-6-138-b. Suspended conveyors, Tower “Y”: Bracing at foot of tower. Unnumbered
Part of William Snaith fonds
Drawing B-10-6-137-d. Suspended stone conveyors, details of Towers “Y” & “Z”. Unnumbered
Part of William Snaith fonds
Drawing B-10-6-136-d. Suspended stone conveyors, Towers “Y” & “Z”: elevations. Unnumbered
Part of William Snaith fonds
Part of William Snaith fonds
Drawing B-10-10-149-b. Coal unloading pit: sections; bill of material. Unnumbered 2 copies
Part of William Snaith fonds
Part of William Snaith fonds
Drawing B-10-10-120-b. Septic tank for general office: plans and sections; bill of materials. No 61
Part of William Snaith fonds
Drawing B-10-10-157-a. Garbage incinerator. No. 60
Part of William Snaith fonds
Drawing B-10-9-116-a. Sanitary privy: elevations, plans, section. No. 59
Part of William Snaith fonds
Part of William Snaith fonds
Part of William Snaith fonds
Drawing B-10-9-167-b. Boarding camp at Chippawa, Building No. 103: foundation plan. No. 56
Part of William Snaith fonds
Part of William Snaith fonds
Part of William Snaith fonds
Drawing B-10-9-164-c. Camp building No. 98: hot water heating system. No. 53
Part of William Snaith fonds
Part of William Snaith fonds
Part of William Snaith fonds
Part of William Snaith fonds
Drawing B-10-9-129-b. Bunkhouse: floor plans, elevations. No. 49
Part of William Snaith fonds
Drawing B-10-9-112-c. Garage: plan, sections, elevations. No. 48
Part of William Snaith fonds
Drawing B-10-9-121-b. Camp building: plan of lavatory fixtures. No. 47
Part of William Snaith fonds
Drawing B-10-9-120-c. Camp building: front and end elevations; sections A-A and B-B. No. 46
Part of William Snaith fonds
Drawing B-10-9-119-c. Camp building: first and second floor plans. Capacity, 52 rooms. No. 45
Part of William Snaith fonds
Drawing B-10-9-113-b. General office: cross section. No. 44
Part of William Snaith fonds
Drawing B-10-9-104-c. General office: basement plan; front and end elevations. No. 43
Part of William Snaith fonds
Drawing B-10-9-103-c. General Office: first and second floor plans, and elevation. No. 42
Part of William Snaith fonds
Drawing B-10-9-110-c. General Storehouse. No 41.
Part of William Snaith fonds
Drawing B-10-9-111-c. General Storehouse: sections and details. No 40
Part of William Snaith fonds
Drawing B-10-7-110-c. Truss for wind load at ends of machine shop. No. 39
Part of William Snaith fonds
Drawing B-10-7-109-c. Heating systems for machine shop. No. 38
Part of William Snaith fonds
Drawing B-10-7-108-b. Design of sliding doors for machine shop. No. 37
Part of William Snaith fonds
Drawing B-10-7-107-c. Details of truss for machine shop. No. 36
Part of William Snaith fonds
Drawing B-10-7-106-c. Cross-sections of machine shop. No. 35
Part of William Snaith fonds
Drawing B-10-7-105-c. Plan and elevations of machine shop. No. 34
Part of William Snaith fonds
Drawing B-10-9-145-a. General dimensions of temporary buildings. No. 33
Part of William Snaith fonds
Drawing B-4-1-161-d. Railway trestle at Bowman’s Gully. No. 32 2 copies
Part of William Snaith fonds
Drawing B-10-6-147-d. Stone Storage: proposed layout of 1” reclaiming conveyors. No. 31
Part of William Snaith fonds
Drawing B-10-6-111-e. Layout of crushing, conveyor and concrete mixing plant at powerhouse. No. 30
Part of William Snaith fonds
Drawing B-10-10-182-c. Portable trolley wire support. No 29
Part of William Snaith fonds
Drawing B-10-1-83-c. Train order signal. No. 28
Part of William Snaith fonds
Drawing B-10-1-85-c. Details of semaphore. No. 27
Part of William Snaith fonds
Drawing B-10-1-84-c. Elevations of semaphore. No. 26
Part of William Snaith fonds
Drawing B-10-10-243-c. Double bridge warning for construction of railway. No. 25
Part of William Snaith fonds