Resource cards
Ajouter au presse-papier
Resource cards
Allward & Gouinlock Architects Inc. fonds
Ajouter au presse-papier
Allward & Gouinlock Architects Inc. fonds
Victoria College - Library addition
Ajouter au presse-papier
Victoria College - Library addition
Mechanical Engineering - additions to, linen
Ajouter au presse-papier
Mechanical Engineering - additions to, linen
Examination Hall - Additions and alterations
Ajouter au presse-papier
Examination Hall - Additions and alterations
School of Nursing - Architectural and structural
Ajouter au presse-papier
School of Nursing - Architectural and structural
Dentistry Building (original) - Architectural and schedules
Ajouter au presse-papier
Dentistry Building (original) - Architectural and schedules
Dentistry Building (original) - Mechanical and Electrical
Ajouter au presse-papier
Dentistry Building (original) - Mechanical and Electrical
Dentistry Building (original) - Schedules S1 - S15
Ajouter au presse-papier
Dentistry Building (original) - Schedules S1 - S15
Lash Miller Chemistry Building - Architectural
Ajouter au presse-papier
Lash Miller Chemistry Building - Architectural
Lash Miller Chemistry Building - Electrical
Ajouter au presse-papier
Lash Miller Chemistry Building - Electrical
Lash Miller Chemistry Building - Mechanical
Ajouter au presse-papier
Lash Miller Chemistry Building - Mechanical
Lash Miller Chemistry Building - Structural
Ajouter au presse-papier
Lash Miller Chemistry Building - Structural
Dentistry Building (addition) - Architectural
Ajouter au presse-papier
Dentistry Building (addition) - Architectural
Dentistry Building (addition) - design and furniture
Ajouter au presse-papier
Dentistry Building (addition) - design and furniture
Dentistry Building (addition) - electrical
Ajouter au presse-papier
Dentistry Building (addition) - electrical
Dentistry Building (addition) - mechanical
Ajouter au presse-papier
Dentistry Building (addition) - mechanical
Dentistry Building (addition) - structural
Ajouter au presse-papier
Dentistry Building (addition) - structural
Dentistry Building (addition) - additions and alterations
Ajouter au presse-papier
Dentistry Building (addition) - additions and alterations
William Snaith fonds
Ajouter au presse-papier
William Snaith fonds
Thesis (undergraduate), Civil Engineering
Ajouter au presse-papier
Thesis (undergraduate), Civil Engineering
Snaith, William. “The Construction Plant, Equipment, and Structures of the Niagara Power Development Scheme of the Hydro-Electric Power Commission of Ontario”Volume II. Drawings. 7-1-27-b: General Plan. Niagara Power Development. 2 copies No. 1
Ajouter au presse-papier
Snaith, William. “The Construction Plant, Equipment, and Structures of the Niagara Power Development Scheme of the Hydro-Electric Power Commission of Ontario”Volume II. Drawings. 7-1-27-b: General Plan. Niagara Power Development. 2 copies No. 1
Drawing B-1-1-1-e. Map showing properties adjacent to proposed location of intake, canal, power station. No. 2
Ajouter au presse-papier
Drawing B-1-1-1-e. Map showing properties adjacent to proposed location of intake, canal, power station. No. 2
Drawing 7-3-92-e. Canal: profile on central line. No. 3
Ajouter au presse-papier
Drawing 7-3-92-e. Canal: profile on central line. No. 3
Drawing B-10-6-104-c. 60” x 84” jaw crusher. No. 4
Ajouter au presse-papier
Drawing B-10-6-104-c. 60” x 84” jaw crusher. No. 4
Drawing B-10-2-149-d. General Drawing. Bucyrus electric revolving shovel, No 225-B. No. 5
Ajouter au presse-papier
Drawing B-10-2-149-d. General Drawing. Bucyrus electric revolving shovel, No 225-B. No. 5
Drawing B-10-4-120-c. General arrangement of cable reel for No. 103-c electric shovel. No. 6
Ajouter au presse-papier
Drawing B-10-4-120-c. General arrangement of cable reel for No. 103-c electric shovel. No. 6
Drawing B-10-4-119-c. Cable drum for electric shovel. No. 103-c. No. 7
Ajouter au presse-papier
Drawing B-10-4-119-c. Cable drum for electric shovel. No. 103-c. No. 7
Drawing B-10-4-117-a. Cable drum for electric shovel. No. 103-c. No. 8
Ajouter au presse-papier
Drawing B-10-4-117-a. Cable drum for electric shovel. No. 103-c. No. 8
Drawing B-10-4-112-c. Cable drum to feed electric shovel. No. 9
Ajouter au presse-papier
Drawing B-10-4-112-c. Cable drum to feed electric shovel. No. 9
Drawing B-10-4-13-b. Cable Drum details. No. 10
Ajouter au presse-papier
Drawing B-10-4-13-b. Cable Drum details. No. 10
Drawing B-10-4-114-a. Detail of trolley for cable drum. No. 11
Ajouter au presse-papier
Drawing B-10-4-114-a. Detail of trolley for cable drum. No. 11
Drawing B-10-2-101-b. Lidgerwood travelling grab bucket, cableway excavator. No. 12
Ajouter au presse-papier
Drawing B-10-2-101-b. Lidgerwood travelling grab bucket, cableway excavator. No. 12
Drawing B-10-5-103-c. Diagram of piping for compressed air. No. 13
Ajouter au presse-papier
Drawing B-10-5-103-c. Diagram of piping for compressed air. No. 13
Drawing B-10-5-117-b. Air reheater. No. 14
Ajouter au presse-papier
Drawing B-10-5-117-b. Air reheater. No. 14
Drawing B-10-10-122-c. Detail of scale box with plate bottom. No. 15
Ajouter au presse-papier
Drawing B-10-10-122-c. Detail of scale box with plate bottom. No. 15
Drawing B-10-1-106. General layout of construction railway. No. 16
Ajouter au presse-papier
Drawing B-10-1-106. General layout of construction railway. No. 16
Drawing B-10-1-81-a. Sketch showing alternative railways to powerhouse. No. 17
Ajouter au presse-papier
Drawing B-10-1-81-a. Sketch showing alternative railways to powerhouse. No. 17
Drawing B-10-1-32. Bill of track material for construction railway. No. 18
Ajouter au presse-papier
Drawing B-10-1-32. Bill of track material for construction railway. No. 18
Drawing C-10-1-104. Standard signs for construction of railway. No. 19
Ajouter au presse-papier
Drawing C-10-1-104. Standard signs for construction of railway. No. 19
Drawing B-10-1-93. Construction of railway: standard switch layout for No. 8 rigid frog & 15 ft. switching points. No. 20
Ajouter au presse-papier
Drawing B-10-1-93. Construction of railway: standard switch layout for No. 8 rigid frog & 15 ft. switching points. No. 20
Drawing B-10-1-121-c. Railway crossing gate. No. 21
Ajouter au presse-papier
Drawing B-10-1-121-c. Railway crossing gate. No. 21
Drawing B-10-1-94-b. Construction of disposal railway: typical sections of roadbed and details of fencing. No. 23
Ajouter au presse-papier
Drawing B-10-1-94-b. Construction of disposal railway: typical sections of roadbed and details of fencing. No. 23
Drawing B-10-1-96-a. Bridge tell-tale. No. 24
Ajouter au presse-papier
Drawing B-10-1-96-a. Bridge tell-tale. No. 24
Drawing B-10-10-243-c. Double bridge warning for construction of railway. No. 25
Ajouter au presse-papier
Drawing B-10-10-243-c. Double bridge warning for construction of railway. No. 25
Drawing B-10-1-84-c. Elevations of semaphore. No. 26
Ajouter au presse-papier
Drawing B-10-1-84-c. Elevations of semaphore. No. 26
Drawing B-10-1-85-c. Details of semaphore. No. 27
Ajouter au presse-papier
Drawing B-10-1-85-c. Details of semaphore. No. 27
Drawing B-10-1-83-c. Train order signal. No. 28
Ajouter au presse-papier
Drawing B-10-1-83-c. Train order signal. No. 28
Drawing B-10-10-182-c. Portable trolley wire support. No 29
Ajouter au presse-papier
Drawing B-10-10-182-c. Portable trolley wire support. No 29
Drawing B-10-6-111-e. Layout of crushing, conveyor and concrete mixing plant at powerhouse. No. 30
Ajouter au presse-papier
Drawing B-10-6-111-e. Layout of crushing, conveyor and concrete mixing plant at powerhouse. No. 30