Drawing B-10-6-147-d. Stone Storage: proposed layout of 1” reclaiming conveyors. No. 31
Add to clipboard
Drawing B-10-6-147-d. Stone Storage: proposed layout of 1” reclaiming conveyors. No. 31
Drawing B-4-1-161-d. Railway trestle at Bowman’s Gully. No. 32 2 copies
Add to clipboard
Drawing B-4-1-161-d. Railway trestle at Bowman’s Gully. No. 32 2 copies
Drawing B-10-9-145-a. General dimensions of temporary buildings. No. 33
Add to clipboard
Drawing B-10-9-145-a. General dimensions of temporary buildings. No. 33
Drawing B-10-7-105-c. Plan and elevations of machine shop. No. 34
Add to clipboard
Drawing B-10-7-105-c. Plan and elevations of machine shop. No. 34
Drawing B-10-7-106-c. Cross-sections of machine shop. No. 35
Add to clipboard
Drawing B-10-7-106-c. Cross-sections of machine shop. No. 35
Drawing B-10-7-107-c. Details of truss for machine shop. No. 36
Add to clipboard
Drawing B-10-7-107-c. Details of truss for machine shop. No. 36
Drawing B-10-7-108-b. Design of sliding doors for machine shop. No. 37
Add to clipboard
Drawing B-10-7-108-b. Design of sliding doors for machine shop. No. 37
Drawing B-10-7-109-c. Heating systems for machine shop. No. 38
Add to clipboard
Drawing B-10-7-109-c. Heating systems for machine shop. No. 38
Drawing B-10-7-110-c. Truss for wind load at ends of machine shop. No. 39
Add to clipboard
Drawing B-10-7-110-c. Truss for wind load at ends of machine shop. No. 39
Drawing B-10-9-111-c. General Storehouse: sections and details. No 40
Add to clipboard
Drawing B-10-9-111-c. General Storehouse: sections and details. No 40
Drawing B-10-9-110-c. General Storehouse. No 41.
Add to clipboard
Drawing B-10-9-110-c. General Storehouse. No 41.
Drawing B-10-9-103-c. General Office: first and second floor plans, and elevation. No. 42
Add to clipboard
Drawing B-10-9-103-c. General Office: first and second floor plans, and elevation. No. 42
Drawing B-10-9-104-c. General office: basement plan; front and end elevations. No. 43
Add to clipboard
Drawing B-10-9-104-c. General office: basement plan; front and end elevations. No. 43
Drawing B-10-9-113-b. General office: cross section. No. 44
Add to clipboard
Drawing B-10-9-113-b. General office: cross section. No. 44
Drawing B-10-9-119-c. Camp building: first and second floor plans. Capacity, 52 rooms. No. 45
Add to clipboard
Drawing B-10-9-119-c. Camp building: first and second floor plans. Capacity, 52 rooms. No. 45
Drawing B-10-9-120-c. Camp building: front and end elevations; sections A-A and B-B. No. 46
Add to clipboard
Drawing B-10-9-120-c. Camp building: front and end elevations; sections A-A and B-B. No. 46
Drawing B-10-9-121-b. Camp building: plan of lavatory fixtures. No. 47
Add to clipboard
Drawing B-10-9-121-b. Camp building: plan of lavatory fixtures. No. 47
Drawing B-10-9-112-c. Garage: plan, sections, elevations. No. 48
Add to clipboard
Drawing B-10-9-112-c. Garage: plan, sections, elevations. No. 48
Drawing B-10-9-129-b. Bunkhouse: floor plans, elevations. No. 49
Add to clipboard
Drawing B-10-9-129-b. Bunkhouse: floor plans, elevations. No. 49
Drawing B-10-9-153-b. Bunkhouse No. 23, Division No. 4: floor plan, elevations, cross section. No. 50
Add to clipboard
Drawing B-10-9-153-b. Bunkhouse No. 23, Division No. 4: floor plan, elevations, cross section. No. 50
Drawing B-10-9-160-c. Camp building No. 98: foundation plan; front and end elevations; section A-A. No. 51
Add to clipboard
Drawing B-10-9-160-c. Camp building No. 98: foundation plan; front and end elevations; section A-A. No. 51
Drawing B-10-9-161-c. Camp building No. 98: ground and second floor plan, with bill of material. No. 52
Add to clipboard
Drawing B-10-9-161-c. Camp building No. 98: ground and second floor plan, with bill of material. No. 52
Drawing B-10-9-164-c. Camp building No. 98: hot water heating system. No. 53
Add to clipboard
Drawing B-10-9-164-c. Camp building No. 98: hot water heating system. No. 53
Drawing B-10-9-165-c. Camp buildings No. 100 &101; first and second floor plans and bill of material. No. 54 sheet 1 of 2 sheets
Add to clipboard
Drawing B-10-9-165-c. Camp buildings No. 100 &101; first and second floor plans and bill of material. No. 54 sheet 1 of 2 sheets
Drawing B-10-9-166-c. Camp building No. 100 &101; foundation plan; front and end elevations; sections A-A and B-B. No. 55 sheet 2 of 2 sheets
Add to clipboard
Drawing B-10-9-166-c. Camp building No. 100 &101; foundation plan; front and end elevations; sections A-A and B-B. No. 55 sheet 2 of 2 sheets
Drawing B-10-9-167-b. Boarding camp at Chippawa, Building No. 103: foundation plan. No. 56
Add to clipboard
Drawing B-10-9-167-b. Boarding camp at Chippawa, Building No. 103: foundation plan. No. 56
Drawing B-10-99-169-c. Boarding Camp at Chippawa, Building No. 103: first and second floor plans; bill of materials. No. 57
Add to clipboard
Drawing B-10-99-169-c. Boarding Camp at Chippawa, Building No. 103: first and second floor plans; bill of materials. No. 57
Drawing B-10-9-170-c. Boarding camp at Chippawa, Building No. 103: elevations and section; bill of materials for fire escape. No. 58.
Add to clipboard
Drawing B-10-9-170-c. Boarding camp at Chippawa, Building No. 103: elevations and section; bill of materials for fire escape. No. 58.
Drawing B-10-9-116-a. Sanitary privy: elevations, plans, section. No. 59
Add to clipboard
Drawing B-10-9-116-a. Sanitary privy: elevations, plans, section. No. 59
Drawing B-10-10-157-a. Garbage incinerator. No. 60
Add to clipboard
Drawing B-10-10-157-a. Garbage incinerator. No. 60
Drawing B-10-10-120-b. Septic tank for general office: plans and sections; bill of materials. No 61
Add to clipboard
Drawing B-10-10-120-b. Septic tank for general office: plans and sections; bill of materials. No 61
Drawing B-10-10-150-a. Brass plates for standard benchmarks, base line and boundary line monuments. No. 62
Add to clipboard
Drawing B-10-10-150-a. Brass plates for standard benchmarks, base line and boundary line monuments. No. 62
Drawing B-10-10-149-b. Coal unloading pit: sections; bill of material. Unnumbered 2 copies
Add to clipboard
Drawing B-10-10-149-b. Coal unloading pit: sections; bill of material. Unnumbered 2 copies
Drawing B-10-6-135-c. Towers and suspended conveyors: details of anchors for towers “Y” & “Z”. Unnumbered
Add to clipboard
Drawing B-10-6-135-c. Towers and suspended conveyors: details of anchors for towers “Y” & “Z”. Unnumbered
Drawing B-10-6-136-d. Suspended stone conveyors, Towers “Y” & “Z”: elevations. Unnumbered
Add to clipboard
Drawing B-10-6-136-d. Suspended stone conveyors, Towers “Y” & “Z”: elevations. Unnumbered
Drawing B-10-6-137-d. Suspended stone conveyors, details of Towers “Y” & “Z”. Unnumbered
Add to clipboard
Drawing B-10-6-137-d. Suspended stone conveyors, details of Towers “Y” & “Z”. Unnumbered
Drawing B-10-6-138-b. Suspended conveyors, Tower “Y”: Bracing at foot of tower. Unnumbered
Add to clipboard
Drawing B-10-6-138-b. Suspended conveyors, Tower “Y”: Bracing at foot of tower. Unnumbered
Drawing B-10-6-144-d. Stone crushing plant: Screen, No. 5 crusher and Tower “W” plan. Unnumbered
Add to clipboard
Drawing B-10-6-144-d. Stone crushing plant: Screen, No. 5 crusher and Tower “W” plan. Unnumbered
Drawing B-10-6-145-d. Stone crushing plant: Screen, No. 5 crusher and Tower “W” plan – elevation and section. Unnumbered
Add to clipboard
Drawing B-10-6-145-d. Stone crushing plant: Screen, No. 5 crusher and Tower “W” plan – elevation and section. Unnumbered
Drawing B-10-6-146-d. Stone crushing plant: Screen, No. 5 crusher and Tower “W” elevations. Unnumbered
Add to clipboard
Drawing B-10-6-146-d. Stone crushing plant: Screen, No. 5 crusher and Tower “W” elevations. Unnumbered
Drawing B-10-6-147-d. Stone storage: proposed layout of 1” stone reclaiming conveyors. Unnumbered
Add to clipboard
Drawing B-10-6-147-d. Stone storage: proposed layout of 1” stone reclaiming conveyors. Unnumbered
Drawing B-10—6-150-d. Suspended conveyors, Tower “X”. Unnumbered
Add to clipboard
Drawing B-10—6-150-d. Suspended conveyors, Tower “X”. Unnumbered
Drawing B-10-6-151-d. Suspended stone conveyors: details of Tower “X”. Unnumbered
Add to clipboard
Drawing B-10-6-151-d. Suspended stone conveyors: details of Tower “X”. Unnumbered
Drawing B-10-6-152-c. Suspended conveyors: anchors for legs of Tower “X”. Unnumbered
Add to clipboard
Drawing B-10-6-152-c. Suspended conveyors: anchors for legs of Tower “X”. Unnumbered
Drawing B-10-1-95-b. Gate for right-of-way fence. No. 22
Add to clipboard
Drawing B-10-1-95-b. Gate for right-of-way fence. No. 22
Whitney Museum of American Art. Colin Lee's drawing in Sing Tao, 21 April 1979
Add to clipboard
Whitney Museum of American Art. Colin Lee's drawing in Sing Tao, 21 April 1979
Mylar drawings for one of several projects on house design
Add to clipboard
Mylar drawings for one of several projects on house design
Get wreck, set design (for dances choreographed by Andrew DeGroat), The Kitchen, New York, NY, September 1978. Slides
Add to clipboard
Get wreck, set design (for dances choreographed by Andrew DeGroat), The Kitchen, New York, NY, September 1978. Slides
House for Giuseppe Panza di Biumo, three drawings and text, Panza di Biumo Collection, Varese, Italy, 1984. Correspondence, notes, sketches, background material
Add to clipboard
House for Giuseppe Panza di Biumo, three drawings and text, Panza di Biumo Collection, Varese, Italy, 1984. Correspondence, notes, sketches, background material
House for Giuseppe Panza di Biumo. Drawings
Add to clipboard
House for Giuseppe Panza di Biumo. Drawings