Showing 12345 results

Archival description
Item
Print preview View:

1143 results with digital objects Show results with digital objects

Basement Floor Plan (Lark-SB)
Basement Floor Plan (Lark-SB)
Project, Stage 1 (L4)
Project, Stage 1 (L4)
Details of north elevation stone lintels (AB-106-60)
Details of north elevation stone lintels (AB-106-60)
Detail of stringer 1A, base to landing, stair No.1 (AB-109-60)
Detail of stringer 1A, base to landing, stair No.1 (AB-109-60)
Plan of railings at stair No.1 (AB-115-60)
Plan of railings at stair No.1 (AB-115-60)
Detail of W.I. screen at north west porch (AB-116-60)
Detail of W.I. screen at north west porch (AB-116-60)
Grating panels (AB-118-60)
Grating panels (AB-118-60)
Floor grilles (AB-124-60)
Floor grilles (AB-124-60)
Hood details (AB-126-60)
Hood details (AB-126-60)
Kitchen and servery layout and details (K1)
Kitchen and servery layout and details (K1)
North west porch
North west porch
(100) Full size detail of corner stone
(100) Full size detail of corner stone
Third floor (cont.) (C-60-1131-4)
Third floor (cont.) (C-60-1131-4)
Frames and doors. - rev. 10 June 1960 (D-60-1131-5)
Frames and doors. - rev. 10 June 1960 (D-60-1131-5)
Furniture layout: third floor. - 1 June 1960 (TC-4)
Furniture layout: third floor. - 1 June 1960 (TC-4)
Paint: third floor; third floor. - 21 June 1960 (C)
Paint: third floor; third floor. - 21 June 1960 (C)
Site Plan (A-1)
Site Plan (A-1)
5" PC haydite slabs for future 4th floor. (5179-E1)
5" PC haydite slabs for future 4th floor. (5179-E1)
Standard top and front grilles for 5000 series air blenders sizes 18 to 60 (562-C-596)
Standard top and front grilles for 5000 series air blenders sizes 18 to 60 (562-C-596)
(1) Detailed roughing-in plan for buttery servery equipment
(1) Detailed roughing-in plan for buttery servery equipment
(1) Landscape treatment. - 5 January 1960. - rev. 29 March 1960;
(1) Landscape treatment. - 5 January 1960. - rev. 29 March 1960;
General arrangement of 1 push up wood shutter (BD.1209)
General arrangement of 1 push up wood shutter (BD.1209)
Plan and details - walks, roads (A.LS.1)
Plan and details - walks, roads (A.LS.1)
Survey Drawing
Survey Drawing
Site Plan
Site Plan
Seating layout
Seating layout
Proposed layout, beneath Strachan Hall
Proposed layout, beneath Strachan Hall
Steps, elevations
Steps, elevations
Floorplan elevations
Floorplan elevations
Floorplan elevations
Floorplan elevations
Section through centre line of theatre
Section through centre line of theatre
Sections through front entry
Sections through front entry
Basement floor plan
Basement floor plan
Reflected ceiling plan
Reflected ceiling plan
Basement floor plan
Basement floor plan
Section
Section
Section
Section
Reflected ceiling plan - main floor
Reflected ceiling plan - main floor
Stage light numbering schedule
Stage light numbering schedule
Elevations, sections and details of auditorium. - rev. June 1978, 29 December 1978, 12 March 1979 (A.9)
Elevations, sections and details of auditorium. - rev. June 1978, 29 December 1978, 12 March 1979 (A.9)
Reflected ceiling plans/details. - rev. 8 June 1978, 27 December 1978 (A.10)
Reflected ceiling plans/details. - rev. 8 June 1978, 27 December 1978 (A.10)
Detail of wood floor nosing for dais 103. - 26 September 1978 (AD-3)
Detail of wood floor nosing for dais 103. - 26 September 1978 (AD-3)
Basement floor plan and details (S3)
Basement floor plan and details (S3)
Site plan and main floor plan - lighting. - rev. 7 March 1979 (E-1)
Site plan and main floor plan - lighting. - rev. 7 March 1979 (E-1)
Main floor plan - power and systems. - rev. 2 June 1978 (E-2)
Main floor plan - power and systems. - rev. 2 June 1978 (E-2)
Basement floor plan - power and systems. - rev. 2 June 1978, 7 March 1979 (E-4)
Basement floor plan - power and systems. - rev. 2 June 1978, 7 March 1979 (E-4)
Alterations to lighting and power in basement and main floor plan. - 1 May 1978 (ER-1)
Alterations to lighting and power in basement and main floor plan. - 1 May 1978 (ER-1)
Addition to exit light in corridor. - 2 June 1978 (ER-2)
Addition to exit light in corridor. - 2 June 1978 (ER-2)
Location of floorpocket. - 28 Sept 1978 (ER-3)
Location of floorpocket. - 28 Sept 1978 (ER-3)
M-3: Basement level - mechanical (M-3)
M-3: Basement level - mechanical (M-3)
Results 51 to 100 of 12345