Print preview Close

Showing 1416 results

Archival description
With digital objects
Print preview View:
North Elevation (107)
North Elevation (107)
South Elevation (106)
South Elevation (106)
East Elevation, West Elevation (108)
East Elevation, West Elevation (108)
East elevation, south elevation to quadrangle
East elevation, south elevation to quadrangle
First Floor Plan, Third Floor Plan
First Floor Plan, Third Floor Plan
Second floor plan (9 students), third floor plan (13 students).
Second floor plan (9 students), third floor plan (13 students).
West elevation, north elevation.
West elevation, north elevation.
Sketch plan of quarters for Dean of Residence, second floor
Sketch plan of quarters for Dean of Residence, second floor
East elevation
East elevation
First floor plan (137)
First floor plan (137)
Second floor plan (138)
Second floor plan (138)
Third floor plan (139)
Third floor plan (139)
South elevation
South elevation
West elevation
West elevation
Layout of Organ - 18 January 1954. - received 21 Jan 54
Layout of Organ - 18 January 1954. - received 21 Jan 54
Layout of Organ - 17 March 1954. - received 21 March 54.
Layout of Organ - 17 March 1954. - received 21 March 54.
Details of stella (cross section)
Details of stella (cross section)
Stella (in relation to location)
Stella (in relation to location)
Models of capitals for columns and pilasters. - undated [1957] (358)
Models of capitals for columns and pilasters. - undated [1957] (358)
Proposed alteration to 4 lights in inner doors to east porch. - 14 December 1955 (354)
Proposed alteration to 4 lights in inner doors to east porch. - 14 December 1955 (354)
Details of baptismal font. - 22 February 1957 (356)
Details of baptismal font. - 22 February 1957 (356)
Columns and pilasters. - undated [1957] (357)
Columns and pilasters. - undated [1957] (357)
Detail of hymn boards. two required. in hardwood finished in textured paint to match stucco. - Se...
Detail of hymn boards. two required. in hardwood finished in textured paint to match stucco. - September 1955 [blueprint] (353)
Applied ornaments on side Chapel ceiling. - 3 January 1956 (355)
Applied ornaments on side Chapel ceiling. - 3 January 1956 (355)
Revised detail of pair of doors, east porch to Chapel. - 16 December 1954 (347)
Revised detail of pair of doors, east porch to Chapel. - 16 December 1954 (347)
Details of organ case screens. - 21 December 1954 (348)
Details of organ case screens. - 21 December 1954 (348)
Details of organ case base, main members and cresting. - 23 December 1954 (349)
Details of organ case base, main members and cresting. - 23 December 1954 (349)
Dons' stalls details of kneelers. - March 1955 (352)
Dons' stalls details of kneelers. - March 1955 (352)
Detail of hymn boards. two required. in hardwood finished in textured paint to match stucco. - Se...
Detail of hymn boards. two required. in hardwood finished in textured paint to match stucco. - September 1955 (353)
Ceiling of narthex, plaster cornice and trim to vestry. - 3 November 1954 (345)
Ceiling of narthex, plaster cornice and trim to vestry. - 3 November 1954 (345)
Revised detail of ceiling of side Chapel. - 1 December 1954. - rev. 12 January, 1 March 1955 (346)
Revised detail of ceiling of side Chapel. - 1 December 1954. - rev. 12 January, 1 March 1955 (346)
Dons' stalls lower portion. - March 1955 (351)
Dons' stalls lower portion. - March 1955 (351)
Head of west transept window. - 28 September 1954. - rev. 29 September 1954 (344)
Head of west transept window. - 28 September 1954. - rev. 29 September 1954 (344)
Oak Doors. - 13 September 1954 (343)
Oak Doors. - 13 September 1954 (343)
Details of upper portion dons' stalls. - 24 March 1955 (350)
Details of upper portion dons' stalls. - 24 March 1955 (350)
Detail of cut stone altar. - 13 Aug 1954. - rev. 11 April 1955 [blueprint] (339)
Detail of cut stone altar. - 13 Aug 1954. - rev. 11 April 1955 [blueprint] (339)
Cresting of reredos elevations and sections. - 20 September 1954 (340)
Cresting of reredos elevations and sections. - 20 September 1954 (340)
Main reredos crest of pylons. - 25 August 1954 (342)
Main reredos crest of pylons. - 25 August 1954 (342)
Main reredos lower portion. - 11 June 1954 (337)
Main reredos lower portion. - 11 June 1954 (337)
Cresting of reredos elevations central motive. - 2 May 1955 (340A)
Cresting of reredos elevations central motive. - 2 May 1955 (340A)
Detail of cut stone altar. - 13 Aug 1954. - rev. 11 April 1955 (339)
Detail of cut stone altar. - 13 Aug 1954. - rev. 11 April 1955 (339)
Main reredos plans above doors to sacristy. - 9 June 1954 (338)
Main reredos plans above doors to sacristy. - 9 June 1954 (338)
Main reredos pinnacles and base of pylons. - 20 August 1954 (341)
Main reredos pinnacles and base of pylons. - 20 August 1954 (341)
Inscription stone east porch. - 18 November 1953 (327)
Inscription stone east porch. - 18 November 1953 (327)
Doorways to sacristy. - 4 January 1954 (329)
Doorways to sacristy. - 4 January 1954 (329)
Detail of leaded glazing. - 2 April 1954 (334)
Detail of leaded glazing. - 2 April 1954 (334)
Layout of leaded glazing. - 7 April 1954 (334A)
Layout of leaded glazing. - 7 April 1954 (334A)
Detail of piscinas in sanctuary and side Chapel. - 20 April 1954 (336)
Detail of piscinas in sanctuary and side Chapel. - 20 April 1954 (336)
Stone details of coping to dwarf wall and cornice side Chapel door to vestry. - 29 December 1953 ...
Stone details of coping to dwarf wall and cornice side Chapel door to vestry. - 29 December 1953 (328)
Detail of credence table in side Chapel. - 24 February 1954 (332)
Detail of credence table in side Chapel. - 24 February 1954 (332)
Results 251 to 300 of 1416