Showing 76 results

Archival description
William Snaith fonds
Print preview View:
William Snaith fonds
William Snaith fonds
Thesis (undergraduate), Civil Engineering
Thesis (undergraduate), Civil Engineering
Snaith, William. “The Construction Plant, Equipment, and Structures of the Niagara Power Development Scheme of the Hydro-Electric Power Commission of Ontario”Volume II. Drawings. 7-1-27-b: General Plan. Niagara Power Development. 2 copies No. 1
Snaith, William. “The Construction Plant, Equipment, and Structures of the Niagara Power Development Scheme of the Hydro-Electric Power Commission of Ontario”Volume II. Drawings. 7-1-27-b: General Plan. Niagara Power Development. 2 copies No. 1
Drawing B-1-1-1-e. Map showing properties adjacent to proposed location of intake, canal, power station. No. 2
Drawing B-1-1-1-e. Map showing properties adjacent to proposed location of intake, canal, power station. No. 2
Drawing 7-3-92-e. Canal: profile on central line. No. 3
Drawing 7-3-92-e. Canal: profile on central line. No. 3
Drawing B-10-6-104-c. 60” x 84” jaw crusher. No. 4
Drawing B-10-6-104-c. 60” x 84” jaw crusher. No. 4
Drawing B-10-2-149-d. General Drawing. Bucyrus electric revolving shovel, No 225-B. No. 5
Drawing B-10-2-149-d. General Drawing. Bucyrus electric revolving shovel, No 225-B. No. 5
Drawing B-10-4-120-c. General arrangement of cable reel for No. 103-c electric shovel. No. 6
Drawing B-10-4-120-c. General arrangement of cable reel for No. 103-c electric shovel. No. 6
Drawing B-10-4-119-c. Cable drum for electric shovel. No. 103-c. No. 7
Drawing B-10-4-119-c. Cable drum for electric shovel. No. 103-c. No. 7
Drawing B-10-4-117-a. Cable drum for electric shovel. No. 103-c. No. 8
Drawing B-10-4-117-a. Cable drum for electric shovel. No. 103-c. No. 8
Drawing B-10-4-112-c. Cable drum to feed electric shovel. No. 9
Drawing B-10-4-112-c. Cable drum to feed electric shovel. No. 9
Drawing B-10-4-13-b. Cable Drum details. No. 10
Drawing B-10-4-13-b. Cable Drum details. No. 10
Drawing B-10-4-114-a. Detail of trolley for cable drum. No. 11
Drawing B-10-4-114-a. Detail of trolley for cable drum. No. 11
Drawing B-10-2-101-b. Lidgerwood travelling grab bucket, cableway excavator. No. 12
Drawing B-10-2-101-b. Lidgerwood travelling grab bucket, cableway excavator. No. 12
Drawing B-10-5-103-c. Diagram of piping for compressed air. No. 13
Drawing B-10-5-103-c. Diagram of piping for compressed air. No. 13
Drawing B-10-5-117-b. Air reheater. No. 14
Drawing B-10-5-117-b. Air reheater. No. 14
Drawing B-10-10-122-c. Detail of scale box with plate bottom. No. 15
Drawing B-10-10-122-c. Detail of scale box with plate bottom. No. 15
Drawing B-10-1-106. General layout of construction railway. No. 16
Drawing B-10-1-106. General layout of construction railway. No. 16
Drawing B-10-1-81-a. Sketch showing alternative railways to powerhouse. No. 17
Drawing B-10-1-81-a. Sketch showing alternative railways to powerhouse. No. 17
Drawing B-10-1-32. Bill of track material for construction railway. No. 18
Drawing B-10-1-32. Bill of track material for construction railway. No. 18
Drawing C-10-1-104. Standard signs for construction of railway. No. 19
Drawing C-10-1-104. Standard signs for construction of railway. No. 19
Drawing B-10-1-93. Construction of railway: standard switch layout for No. 8 rigid frog & 15 ft. switching points. No. 20
Drawing B-10-1-93. Construction of railway: standard switch layout for No. 8 rigid frog & 15 ft. switching points. No. 20
Drawing B-10-1-121-c. Railway crossing gate. No. 21
Drawing B-10-1-121-c. Railway crossing gate. No. 21
Drawing B-10-1-94-b. Construction of disposal railway: typical sections of roadbed and details of fencing. No. 23
Drawing B-10-1-94-b. Construction of disposal railway: typical sections of roadbed and details of fencing. No. 23
Drawing B-10-1-96-a. Bridge tell-tale. No. 24
Drawing B-10-1-96-a. Bridge tell-tale. No. 24
Drawing B-10-10-243-c. Double bridge warning for construction of railway. No. 25
Drawing B-10-10-243-c. Double bridge warning for construction of railway. No. 25
Drawing B-10-1-84-c. Elevations of semaphore. No. 26
Drawing B-10-1-84-c. Elevations of semaphore. No. 26
Drawing B-10-1-85-c. Details of semaphore. No. 27
Drawing B-10-1-85-c. Details of semaphore. No. 27
Drawing B-10-1-83-c. Train order signal. No. 28
Drawing B-10-1-83-c. Train order signal. No. 28
Drawing B-10-10-182-c. Portable trolley wire support. No 29
Drawing B-10-10-182-c. Portable trolley wire support. No 29
Drawing B-10-6-111-e. Layout of crushing, conveyor and concrete mixing plant at powerhouse. No. 30
Drawing B-10-6-111-e. Layout of crushing, conveyor and concrete mixing plant at powerhouse. No. 30
Drawing B-10-6-147-d. Stone Storage: proposed layout of 1” reclaiming conveyors. No. 31
Drawing B-10-6-147-d. Stone Storage: proposed layout of 1” reclaiming conveyors. No. 31
Drawing B-4-1-161-d. Railway trestle at Bowman’s Gully. No. 32 2 copies
Drawing B-4-1-161-d. Railway trestle at Bowman’s Gully. No. 32 2 copies
Drawing B-10-9-145-a. General dimensions of temporary buildings. No. 33
Drawing B-10-9-145-a. General dimensions of temporary buildings. No. 33
Drawing B-10-7-105-c. Plan and elevations of machine shop. No. 34
Drawing B-10-7-105-c. Plan and elevations of machine shop. No. 34
Drawing B-10-7-106-c. Cross-sections of machine shop. No. 35
Drawing B-10-7-106-c. Cross-sections of machine shop. No. 35
Drawing B-10-7-107-c. Details of truss for machine shop. No. 36
Drawing B-10-7-107-c. Details of truss for machine shop. No. 36
Drawing B-10-7-108-b. Design of sliding doors for machine shop. No. 37
Drawing B-10-7-108-b. Design of sliding doors for machine shop. No. 37
Drawing B-10-7-109-c. Heating systems for machine shop. No. 38
Drawing B-10-7-109-c. Heating systems for machine shop. No. 38
Drawing B-10-7-110-c. Truss for wind load at ends of machine shop. No. 39
Drawing B-10-7-110-c. Truss for wind load at ends of machine shop. No. 39
Drawing B-10-9-111-c. General Storehouse: sections and details. No 40
Drawing B-10-9-111-c. General Storehouse: sections and details. No 40
Drawing B-10-9-110-c. General Storehouse. No 41.
Drawing B-10-9-110-c. General Storehouse. No 41.
Drawing B-10-9-103-c. General Office: first and second floor plans, and elevation. No. 42
Drawing B-10-9-103-c. General Office: first and second floor plans, and elevation. No. 42
Drawing B-10-9-104-c. General office: basement plan; front and end elevations. No. 43
Drawing B-10-9-104-c. General office: basement plan; front and end elevations. No. 43
Drawing B-10-9-113-b. General office: cross section. No. 44
Drawing B-10-9-113-b. General office: cross section. No. 44
Drawing B-10-9-119-c. Camp building: first and second floor plans. Capacity, 52 rooms. No. 45
Drawing B-10-9-119-c. Camp building: first and second floor plans. Capacity, 52 rooms. No. 45
Drawing B-10-9-120-c. Camp building: front and end elevations; sections A-A and B-B. No. 46
Drawing B-10-9-120-c. Camp building: front and end elevations; sections A-A and B-B. No. 46
Drawing B-10-9-121-b. Camp building: plan of lavatory fixtures. No. 47
Drawing B-10-9-121-b. Camp building: plan of lavatory fixtures. No. 47
Drawing B-10-9-112-c. Garage: plan, sections, elevations. No. 48
Drawing B-10-9-112-c. Garage: plan, sections, elevations. No. 48
Drawing B-10-9-129-b. Bunkhouse: floor plans, elevations. No. 49
Drawing B-10-9-129-b. Bunkhouse: floor plans, elevations. No. 49
Results 1 to 50 of 76