Identity area
Reference code
Title
Date(s)
- 1972-1977 (Creation)
Level of description
Series
Extent and medium
0.33 m of textual records and publications
Context area
Name of creator
Archival history
Immediate source of acquisition or transfer
Content and structure area
Scope and content
The controversy caused by the proposed construction of major power lines through populated southern Ontario resulted in Omond Solandt being appointed in 1972 to head a commission of public inquiry into the transmission of power from Nanticoke to Pickering. The following year the inquiry was extended to include an examination of the proposed route between Lennox and Oshawa. Dr. Solandt held public hearings in the affected municipalities between May, 1974 and January, 1975.
Present are correspondence, press coverage, drafts of papers, and reports relating to the inquiry and to the Ontario Royal Commission on Electric Power.
Appraisal, destruction and scheduling
Accruals
System of arrangement
Conditions of access and use area
Conditions governing access
Open
Conditions governing reproduction
Language of material
Script of material
Language and script notes
Physical characteristics and technical requirements
Finding aids
For a detailed listing of this series, see Appendix 23 in Finding Aid Inventory.