Identifier Sort ascending Title Level of description Date Digital object
/B2015-2 (01) 02 OBC Matrix, Existing Building Plans, Site Survey (A002) Item 2015
/B2015-2 (01) 03 Door Schedule and Details, Window Schedules and Details (A100) Item 2015
/B2015-2 (01) 06 Archives Furnishing Plan (A102F) Item 2015
/B2015-2 (01) 07 Reflected Ceiling Plan (Basement Level) (A103) Item 2015
/B2015-2 (01) 18 General Notes (S001) Item 2015
/B2015-2 (01) 23 Ground Floor Framing Plan (S201) Item 2015
/B2015-2 (01) 25 Third Floor Framing Plan (S203) Item 2015
/B2015-2 (01) 26 Sections and Details (S400) Item 2015
/B2015-2 (01) 33 Plumbing Demolition - Partial Basement Plan (M105) Item 2015
/B2015-2 (01) 34 Plumbing - Partial Basement Plan (M106) Item 2015
/B2015-2 (01) 39 HVAC Demolition/Proposed - Partial Ground & Second Floor Plans (M2.5) Item 2015
/B2015-2 (01) 50 Power and Systems Layout - Basement Plan (E2.2) Item 2015
/B2015-2 (01) 53 Schedules (E4.1) Item 2015
/B2015-2 (01) 55 Additional conduits for communication (E4.3) Item 2015
/B2015-2 (02) Trinity College Archives and Elevator Drawings - July 24 2015 Project 13-110-01 File 2015-02 to 2015-07
/B2015-2 (02) 02 Basement Demolition, Removal Plan and RCP(A101) Item 2015-02 to 2015-07
/B2015-2 (02) 09 Elevator Demolition and Proposed Plans (A200) Item 2015-02 to 2015-07
/B2015-2 (02) 10 Elevator Sections (A201) Item 2015-02 to 2015-07
/B2015-2 (03) 03 Typical Details (S010) Item 2015-02 to 2015-07
/B2015-2 (03) 10 Partial Basement (M-101) Item 2015-02 to 2015-07
/B2015-2 (03) 15 Partial Basement Plan - Plumbing (M-106) Item 2015-02 to 2015-07
/B2015-2 (03) 20 Ground Source System - Piping Schematics (M2.4) Item 2015-02 to 2015-07
/B2015-2 (01) 04 Basement Removal Plan and Reflecting Ceiling Plan Repairs (A101) Item 2015
/B2015-2 (01) 12 Millwork and Ceiling Details (A107) Item 2015
/B2015-2 (01) 13 Finish Schedule, Tile Layout Plan, Misc. Details (A108) Item 2015
/B2015-2 (01) 14 Casework Details (A109) Item 2015
/B2015-2 (01) 15 Elevator Demolition and Proposed Plans; Basement, Ground, Second and Mezzanine (A200) Item 2015
/B2015-2 (01) 22 Basement Framing Plan (S200) Item 2015
/B2015-2 (01) 24 Second Floor Framing Plan (S202) Item 2015
/B2015-2 (01) 31 Sprinklers Separate Prices - Overall Plan (M103) Item 2015
/B2015-2 (01) 32 Sprinklers - Partial Second & Third Floor Plans (M104) Item 2015
/B2015-2 (02) 07 Archives Elevations (A106) Item 2015-02 to 2015-07
/B2015-2 (02) 08 Casework Details (A109) Item 2015-02 to 2015-07
/B2015-2 (03) Trinity College Archives and Elevator Drawings - Additional Drawings - July 24 2015 - Project 13-110-01 File 2015-02 to 2015-07
/B2015-2 (03) 18 Partial Basement Floor Plan - Piping Layout - Project 13-228 (M2.2) Item 2015-02 to 2015-07
/B2015-2 (03) 21 Details 1 (M2.5) Item 2015-02 to 2015-07
/B2015-2 (03) 25 Schedules 2 (M2.9) Item 2015-02 to 2015-07
/B2015-2 (01) 01 Fire Separations, Assemblies, Site Plan (A001) Item 2015
/B2015-2 (01) 11 Archives Furnishing Elevations (A106F) Item 2015
/B2015-2 (01) 16 Elevator Sections (A201) Item 2015
/B2015-2 (01) 21 Typical Details (S011) Item 2015
/B2015-2 (01) 27 Sprinklers Demolition - Partial Basement Plan (West) (M101A) Item 2015
/B2015-2 (01) 35 HVAC - Partial Basement Plan (M2.1) Item 2015
/B2015-2 (01) 40 Details 1 (M2.6) Item 2015
/B2015-2 (01) 41 Details 2 (M2.7) Item 2015
/B2015-2 (01) 42 Schedules 1 (M2.8) Item 2015
/B2015-2 (01) 43 Schedules 2 (M2.9) Item 2015
/B2015-2 (01) 45 Legend & Details (E1.0) Item 2015
/B2015-2 (01) 49 Lighting Layout - Partial Ground Floor, Second and Third Floor (E2.1) Item 2015
/B2015-2 (01) 54 Schematics - Door Control & Other Low Voltage Equipment (E4.2) Item 2015