File 32 - 1984 Constitutions: Correspondence with Sacred Congregation for the Evangelization of Peoples: Grant of extension of time to draft new Constitutions

Identity area

Reference code

CA ON00389 F26-3-1-32

Title

1984 Constitutions: Correspondence with Sacred Congregation for the Evangelization of Peoples: Grant of extension of time to draft new Constitutions

Date(s)

  • Mar. 1978 (Creation)

Level of description

File

Extent and medium

1 folder of textual records

Context area

Name of creator

Archival history

Immediate source of acquisition or transfer

Content and structure area

Scope and content

Appraisal, destruction and scheduling

Accruals

System of arrangement

Conditions of access and use area

Conditions governing access

Conditions governing reproduction

Language of material

    Script of material

      Language and script notes

      Physical characteristics and technical requirements

      Finding aids

      Allied materials area

      Existence and location of originals

      Existence and location of copies

      Related units of description

      Notes area

      Alternative identifier(s)

      Previous Identifier

      F01-S01-03/003(02)

      Location

      Box 88, File 2

      Access points

      Subject access points

      Place access points

      Name access points

      Genre access points

      Description control area

      Description identifier

      Institution identifier

      Rules and/or conventions used

      Dates of creation revision deletion

      Created by F Rousselle 26 Feb. 2025.

      Language(s)

        Script(s)

          Sources

          Accession area